sales@aoktac.com    +86-576-84216466
Cont

Have any Questions?

+86-576-84216466

Jun 12, 2021

Operating Specification Of Blow Molding Machine

(1) Before starting each shift, lubricating oil must be added to each movable part once. (Manipulator, manipulator guide rail, mold opening and closing guide rail)

(2) The swing arm can be added once every (3-4) days. The large chain and small chain of the heating machine can be used once a month. Frequently check whether the reducer of the main engine and the reducer of the heating machine are short of oil. The main engine bearing can be added once every 3 months.

(3) Before production, check whether the moving parts are firm, whether the screws are loose and fall off, especially in places with strong impact, whether the belt drive part is abnormal.

(4) Check whether the high-pressure gas source, low-pressure gas source, power source, and water source are normal.

(5) Check whether each emergency stop switch, safety door switch, and protection device detection switch are normal.

(6) Check whether the heating head enters the embryo and the embryo drop is working properly. If the embryo insertion is not in place, the nut of the embryo pressing device can be adjusted.

(7) Check whether the lamp tube is damaged or broken. It should be replaced in time.

(8) Check whether the pneumatic components are leaking and whether their movements are sensitive.

(9) Check whether the triplet is abnormally leaking, whether it is blocked, and whether the water cup is too full.

(10) When the solenoid valve of the automatic bottle blowing machine encounters an abnormality, it should be cleaned in time (cleaning every 3.5 million bottles). 



Send Inquiry